Excavation in foundation of building, bridges etc complete: in ordinary soil
Pcc (1:3:6) mass concrete less form work using 50% boulders
Errecting and removing of formwork to concrete in any shape/position (vertical).
Random rubble masonry in foundn. & plinth Dry masonry.
-Random rubble masonry in F&P csm (1:6) as spd
Structural Backfill using Common Material brought from outside
Rehandling of Gravel work or excavated rock lead upto 25m
Pcc (1:4:8) i.c placing compacting finishing etc as spd
Pcc (1:2:4) i.c placing compacting finishing etc as spd
Providing and Fixing marble strip 2" wide and 3/8" thick for dividing the floor into panels
Supply and Fixing aluminium alloy road studs as per specs Large, strip 146x30mm, 171 beads: Bi-direction
Pcc (1:3:6) i.c placing compacting finishing etc as spd
Providing & laying R.C.C. pipe sewers, moulded with cement concrete 1:1-1/2:3 conforming to ASTM specification C-76-79, Class III, Wall B, including carriage, lowering in trenches to correct alignment and grade, jointing with rubber ring, cutting pipes where necessary, testing, etc.complete:- 24" i/d, Wall B
Providing & laying R.C.C. pipe sewers, moulded with cement concrete 1:1-1/2:3 conforming to ASTM specification C-76-79, Class III, Wall B, including carriage, lowering in trenches to correct alignment and grade, jointing with rubber ring, cutting pipes where necessary, testing, etc. complete:- 18" i/d, Wall B
Providing & laying R.C.C. pipe sewers, mouldedwith cement concrete 1:1-1/2:3 conforming toASTM specification C-76-79, Class III -B, WallB, including carriage, lowering in trenches tocorrect alignment and grade, jointing with rubber ring, cutting pipes where necessary, testing, etc.complete:- 12" i/d, Wall thickness 2"
Providing and laying R.C.C. pipe, moulded with cement concrete 1:1-1/2:3, with spigot, socket or collar joint, etc. including cost of reinforcement, conforming to B.S. 5911: Part-I, 1981 Class "L" including carriage, lowering in trenches to correct alignment and grade, jointing, cutting pipe where necessary, finishing and testing, etc. complete:- 9" dia:
RCC in roof slab, beam, column & other structural members, insitu or precast. (1:2:4)
Supply & fabricate M.S. reinforcement for cement concrete (Hot rolled deformed bars Grade 40)
TOTAL Rs:-
Add Area Cost Factor 1.08 on MRS-202
Tractor 440 with Blad
Excavator