Loading...

Civil Construction Tenders in Kpk

Explore latest Civil Construction Tenders in Kpk by Categories. Now you can see all Civil Construction Tenders and auction notice at one place directly from tenderalert.pk. Stay updated with the current and upcoming advertisement from newspapers and regulatory authorities like PPRA, SPPRA, KPPRA, and BPPRA.

All Active Closed

RCC strong room conversion

Lahore, Swat,
Status: Active     Publish Date: 2026/06/06

Street Light, Entry Gate, Latrine Blocks, Group Latrine, Monuments, Waiting Shed, Beautification, Improvement, Resting Area, Cricket ground, Balyamina, Samana, Coloring, Painting, Green belting, Asphalt Passage, Drainage system

Hangu,
Status: Active     Publish Date: 2026/06/06

Electrical mechanical components, Lift irrigation schemes, Civil repair channels, Minors, Branches, Horse shoe bund, Rehabilitation clearance kathas, Canal, Flood control, Drainage

Peshawar,
Status: Active     Publish Date: 2026/06/06

Uplifting Beautification Activities including Infrastructure Improvement, Monuments, Street Lights, Green Spaces, Entry Gate, Latrine Blocks, Group, Waiting Shed, Picnic Spot, Resting area, Asphalt Passage, Thall, Mosque, drainage system bypass road

Hangu,
Status: Active     Publish Date: 2026/06/06

WSS Solarization, SMALL SCALE SOLAR BASED DWSS, COMMUNITY BASED DWSS, DRINKING WATER INFRASTRUCTURE FOR SCATTERED POPULATION, EXTENSION IMPROVEMENT OF WSS

Peshawar,
Status: Active     Publish Date: 2026/06/06

establishment of nursing college

Peshawar,
Status: Active     Publish Date: 2026/06/06

Construction Improvement of Food Street, Welcome Gate, Waiting Area, Installation of Solar Street Lights, Minhajoor View Point, Feature Wall Facelifting, Chowks Squares, Exit Jhaji Traditional Style, Walking Jogging Track, Dustbins in Village Councils, Public Toilets, Shahi Masjid, Streets with Tuff Tiling PCC Side Drains, Meena Bazar, Road Leading to NADRA Office

Chitral,
Status: Active     Publish Date: 2026/06/06

Beautification Activities, Street Lights, Annual Maintenance, Repair, Civil Works, Water Supply Schemes, Electrical, Mechanical

Kohat,
Status: Active     Publish Date: 2026/06/06

Construction of Fire Watch Tower

Swat,
Status: Active     Publish Date: 2026/06/06

Construction of drinking water supply, Sanitation schemes, Pressure pump, PCC street, Path, Sewerage line, Culvert, Protection wall

Battagram,
Status: Active     Publish Date: 2026/06/06

Rehabilitation, Repair, Masjid, PCC Street, Pavements, Drains, Culverts, Retaining Wall, Solar Integrated Lights, Construction, Renovation

Mardan,
Status: Active     Publish Date: 2026/06/06

Uplift Beautification activities, Improvement Family Park, Installation of sign board, Supply dustbin, wall art, Link Road, Solar Street Light, Food, Footpath, Seating Area, Sun Shade, Back light Board

Chitral,
Status: Active     Publish Date: 2026/06/06

Solar System and Construction Work

Chitral,
Status: Active     Publish Date: 2026/06/06

Pavement of Streets, Infrastructure Improvement, DWSS, Sanitation Scheme

Peshawar,
Status: Closed     Publish Date: 2026/06/06

Distribution Line Compound Wall Reservoir Solarization, Mini Tube Well, DWSS

Karak,
Status: Closed     Publish Date: 2026/06/06
Status: Closed     Publish Date: 2026/06/06
Status: Closed     Publish Date: 2026/06/06
Status: Active     Publish Date: 2026/06/05

Beautification, Improvement, Culturally Significant Structure, Uplifting, Roads, Streets, Through Street Lights, Beautification, Sign Boards

Kohat,
Status: Active     Publish Date: 2026/06/05
Status: Active     Publish Date: 2026/06/05

Civil Work and Electrical Work

Nowshera,
Status: Active     Publish Date: 2026/06/05

Solar System and Construction Work

Dera Ismail Khan,
Status: Active     Publish Date: 2026/06/05

Beautification Activities, Street Lights, Annual Maintenance, Repair, Civil Works, Existing Water Supply Schemes, Public Health Engineering, Electrical, Mechanical

Kohat,
Status: Active     Publish Date: 2026/06/05

establishment of tribal nursing college

Peshawar,
Status: Active     Publish Date: 2026/06/05

Construction of Drinking Water Supply, Sanitation Schemes

Chitral,
Status: Active     Publish Date: 2026/06/05
Status: Active     Publish Date: 2026/06/05

Construction Work of new block and electrification

Swabi,
Status: Active     Publish Date: 2026/06/05
Status: Active     Publish Date: 2026/06/05

uplift beautification activities and street light

Swat,
Status: Active     Publish Date: 2026/06/05

Construction Work

Peshawar,
Status: Active     Publish Date: 2026/06/05

APMS, Asset Performance Management System, Enclosure, Installation, Configuration, Testing, Commissioning, Equipment

Abbottabad,
Status: Active     Publish Date: 2026/06/05
Status: Active     Publish Date: 2026/06/05

Development of Green Belt

Mardan,
Status: Active     Publish Date: 2026/06/05
Status: Active     Publish Date: 2026/06/05

Construction, Improvement, Rehabilitation, Widening, PCC, BTR

Peshawar,
Status: Active     Publish Date: 2026/06/05

Installation of Street Light, Construction Entry Gate, Supply CCTV Camera, Beautification, Improvement, Shingling Road, Brick Soling, Pavement, PCC, Drainage, Protection Wall, Sanitation Scheme

Hangu,
Status: Active     Publish Date: 2026/06/05

Uplifting, Beautification, Infrastructure Improvement, Monuments, Street Lights, Green Spaces, Construction, Model Street

Tank,
Status: Active     Publish Date: 2026/06/05

Rehabilitation, Repair, Masjid, Construction, PCC Street, Pavements, Drains, Culverts, Retaining Wall, Solar Integrated Lights, Parkho, Renovation

Mardan,
Status: Active     Publish Date: 2026/06/05

Construction, Soling, Drain, Pavement, Sewerage, Scheme, Water, Supply, Tuff, Tile, Culvert, Boundary, Wall, Rehabilitation, Street, Light

Swat,
Status: Active     Publish Date: 2026/06/05

Tuff Tile, Street Pavement, Installation, Lights, Construction, Green, Beautification, Activities, Monument, Gate, Examination Hall, Shading, Ceramic, Flooring, Plantation, Walking Track, Solar, Fencing, Protection, Boundary Wall, Drainage, Grill, Solarization

Buner,
Status: Closed     Publish Date: 2026/06/05

Energisation of Sub Station, Oxygen Generation Plant

Bannu,
Status: Closed     Publish Date: 2026/06/05

Solarization, Schemes, Gravity, Water Supply, Construction, Rehabilitation, Sanitation, Installation, Electric Based Pressure Pumps

Lakki Marwat,
Status: Closed     Publish Date: 2026/06/05

Construction of Academic Block, Examination, Multi Purpose Hall Library Cafeteria External Infrastructure Works, Electrification

Swabi,
Status: Closed     Publish Date: 2026/06/05

Annual, Maintenance, Repair, Civil, Work, Completed, Water, Supply, Scheme, Electric, Motor, Pump, Transformer, Voltage, Regulator, College

Mansehra,
Status: Closed     Publish Date: 2026/06/05

supply and installation of office partitioning work

Nowshera,
Status: Closed     Publish Date: 2026/06/05

Uplifting, Beautification Activities, Infrastructure Improvement, Monuments, Street Lights, Green Spaces, Pathways, Rehabilitation of Drains

Swat,
Status: Active     Publish Date: 2026/06/04

M&R Road, Shingling, Construction of protection bund, retaining wall, causeway, culvert, Pavement, drainage, Soling, Street Light, installation of hand pump, solar system, water supply, tube well, pipe line, transformer, Electric Work, repair, PCC Road, Shifting of poles, rehabilitation, black topping, Provision, Tuff Paver, Slabs, Footpath, Bridge, boundary, solarization

Buner,
Status: Active     Publish Date: 2026/06/04

Uplift, Beautification Activities, Improvement, Family Park, Installation, Sign Board, Shops, Bazar, Drains, Supply, Dustbin, Wall Art, Link Road, Solar Street Light, Footpath, Seating Area, Sun Shade, Back light Board

Chitral,
Status: Active     Publish Date: 2026/06/04

Emergency Restoration of Flood Damages, Drinking Water Supply Scheme

Upper Dir,
Status: Active     Publish Date: 2026/06/04

Construction, Fire Watch Towe

Swat,
Status: Active     Publish Date: 2026/06/04